Building 11 is a 982,800 SF CSX rail serviced building designed to serve the plastic resin and paper exporters with large volume export capacity. This building backs up to the CSX main switching location for the Southeast and will have a 300 rail car storage capacity.
It is expected that this facility will produce 10 turns per day making this the largest, most efficient rail operations facility in the United States.
It is expected that this facility will produce 10 turns per day making this the largest, most efficient rail operations facility in the United States.
LocationSavannah, GA
Size982,800 SF SF
Acres99.68
Building TypeRail Served