Phase 2 – West Side Terminal at Shipyard Creek Logistics Center is a 259,200-square-foot Class A cross-dock facility on 26.6 acres, currently active and leased by East Coast Warehouse, with the facility becoming available in October 2025. Strategically designed for high-volume throughput and port-centric operations, this facility offers dual-load functionality, expansive yard space, and excellent connectivity to Charleston’s deepwater terminals and interstate network.
Phase 1 – East Side Terminal at Shipyard Creek Logistics Center is a 160,250-square-foot Class A transload facility situated on 41.58 acres, completed in February 2025. Purpose-built for port-centric logistics, this facility is designed to handle high-volume transloading, storage, and freight operations with maximum efficiency.