Home Portfolio Georgia Phase 2 Building 5

Central Port Logistics Center Phase 2 Building 5

Rear Load 284,580 SF 18 Acres

Phase 2 – Building 5 at Central Port Logistics Center is a Class A rear-load industrial facility totaling 284,580 square feet on 18 acres, with delivery scheduled for November 2025. Engineered for modern logistics and distribution users, Building 5 offers trailer parking, efficient circulation, and flexible space planning for a wide range of industrial applications.

  • Building Dimensions 310’D x 918’L
  • Clear Height 32’
  • Column Spacing 54’ Wide x 50’ Deep, 60’ at Speed Bays
  • Drive in Doors (2) 12’ x 16’
  • Dock Doors (55) 9’ x 10’
  • Dock Levelers (55) 45,000 LB Mechanical (7’ x 8’)
  • Speculative Office 3,000 SF
  • Truck Court 185’
  • Trailer Parking 67
  • Car Parking 144 Spaces, 12 EV Charging Spaces
  • Floor 7” Thick 4,000 psi
  • Roof 20 Year, 45 Mil
  • Electrical 4,000 amp
  • Sprinkler ESFR
  • Air Changes Building Management System