Central Port Logistics Center Phase 2 Buildings 11A
Phase 2 – Building 11A at Central Port Logistics Center features two Class A rear-load flex buildings, totaling 150,000 square feet on 12.58 acres, completed in May 2025. Designed for flexibility and speed-to-market, these buildings offer modern layouts ideal for light manufacturing, distribution, and last-mile logistics users.
- Building Dimensions 150’D x 1,000’L
- Clear Height 28’
- Column Spacing 50’ Wide x 50’ Deep
- Drive in Doors (2) 12’ x 16’
- Dock Doors (15) 9’ x 10’
- Dock Levelers (5) 45,000 LB Mechanical (7’ x 8’)
- Speculative Office (1) 2,023 SF
- Truck Court 140’
- Car Parking 90 Spaces, 8 EV Charging Spaces
- Floor 7” Thick 4,000 psi
- Roof 20 Year, 60 Mil
- Electrical 400 amp
- Sprinkler ESFR
- Air Changes Building Management System