Shipyard Creek Logistics Center Phase 2 West Side Terminal
Phase 2 – West Side Terminal at Shipyard Creek Logistics Center is a 259,200-square-foot Class A cross-dock facility on 26.6 acres, currently active and leased by East Coast Warehouse, with the facility becoming available in October 2025. Strategically designed for high-volume throughput and port-centric operations, this facility offers dual-load functionality, expansive yard space, and excellent connectivity to Charleston’s deepwater terminals and interstate network.
- Building Dimensions 320’D x 810’L
- Clear Height 36’
- Column Spacing 54’ Wide x 50’ Deep, 60’ at Speed Bays
- Drive in Doors (4) 14’ x 16’
- Dock Doors (64) 9’ x 10’
- Dock Levelers (64) 45,000 LB Mechanical (7’ x 8’)
- Speculative Office (1) 14,414 SF, (1) 3,500 SF, (1) 532 SF
- Truck Court 185’
- Trailer Parking 368 Spaces
- Car Parking 157 Spaces
- Floor 7” Thick 4,000 psi
- Roof 15 Year, 45 Mil
- Electrical 4,000 amp
- Sprinkler ESFR
- Air Changes Building Management System